I/O Setup and Configuration

The following are the suggested integration and timing sequences for the 1) Standard Operation, 2) Operation with Fault/E-Stop Recovery, and 3)  Operation with Serial Data String

 

Color Code

 

1) Standard Operation

 

Standard Suggested I-O sequence

 

2) Operation with Fault/E-Stop Recovery

 

Operation with Fault/E-Stop recovery

 

3) Operation with Serial Data String

 

Suggested sequence with Serial data string